CLEANING OF STORM DRAINS & GULLIES

From Monday 2 August 2021 our cleaning contractor, One Complete Service will be cleaning out all the storm drains, gullies and drainage cannels in all Terraces and Mews using a large vacuum tanker lorry. This is being done to reduce flooding over the winter months. We anticipate that it will take about two days to complete.

The vacuum tanker will require access to all the gully pots. Therefore, we kindly ask you not to park above or on top of any gully grate and/or drain cover because they need to be accessed and/or lifted to allow the vacuum hose to suck out the contents. You may be asked by our staff to move vehicles to facilitate access. If this is required, your assistance would be greatly appreciated and will help reduce the cost of these works.

The CEPC thanks you for your cooperation during these works and apologises for any inconvenience they may cause.

Should you require any further information or assistance please do not hesitate at all in contacting the CEPC via: info@cepc.org.uk or 020 7935 8049 or 07774 938 715 (24 hrs)

INDEPENDENCE DAY CELEBRATIONS

• The Outer Circle carriageway and park side footpaths will be closed from Hanover Gate to Macclesfield Bridge on Wednesday 21 July 2021, for the Independence Day celebrations at Winfield House. The road closure will be in place from 15:00 – 22:30. Pedestrians can still use the footpath on the western side of the Outer Circle.

• During the road closure the Metropolitan Police have asked if Residents and guests in vehicles could please enter/leave your property via Macclesfield Bridge.

• To allow the Police to maintain maximum security within the cordon, can you please forward a list of everybody who will be visiting your property including guests or tradesmen, including vehicle type, colour and registration number?

• If you have a security post or housekeeper, can you please provide a telephone number the Police can call to verify anyone who arrives unexpected and is not on the list.

The CEPC thanks you for your cooperation during this closure and apologises for any inconvenience that this may cause. martyn.floodgate@cepc.org.uk or 020 7935 8049 or 07774 938 715 (24 hrs).

Parking Suspension Cambridge Gate

We are writing to inform you that all parking within Cambridge Gate will be suspended on 19 July 2021 to allow for our contractors to undertake essential excavation work to the road ahead of the resurfacing works that will happening later in the year.

To accommodate these excavations, we have arranged temporary parking at Cambridge Terrace which will be available for you to use from 8am to 5pm on the above date. We appreciate that some residents may have a problem with moving vehicles, but we have been advised from the contractors that the road must be clear of all vehicles in order to carry out the work effectively. If the contractors are unable to carry out the necessary works due to the road not being clear, we may incur extra costs which will ultimately be borne by ratepayers.

We hope the above is clear however, if you have any queries, please contact the CEPC Surveyor on 07940 470998.

Thank you for your co-operation.